Safe Water Systems

By Centers for Disease Control and Prevention

Contributed By POUZN Project

Published: 2006

This is the CDC website on Safe Water systems, describing the elements of the system: point-of-use treatment, safe water storage and behavior change techniques. It links to frequently asked questions about Safe Water Systems.

Document Details

Type of Document Link
Topic(s) Diarrheal Prevention & Treatment, Point of Use Water Treatment
Keywords(s) point-of use water treatment, safe water storage, behavior change
Date posted 02/2006